Blog
Nov 16, 2026
Field notes: two plants that matched on paper, nothing alike at the gateA dual-source shortlist put two plants side by side on footprint and scale. The site walk told a different story. Notes from the gate.
Nov 16, 2026
Which plant to model when your reference supplier runs multiple sitesA reference supplier with several facilities complicates dual-sourcing. Here's how to pick the one plant to benchmark before you search for a second source.
Nov 9, 2026
Same plant type vs same production process: what has to match for a second sourceWhy matching plant type isn't enough for a second source, and what process fit requires before a candidate goes on the shortlist.
Nov 9, 2026
What is an approved vendor list, and how does a second source get on one?What an approved vendor list is, how AVL qualification works, and where a second-source candidate enters the process.
Nov 2, 2026
Field notes: the trade-fair floor where every booth looked like the right plantA sourcing manager's notes from a trade-fair floor, on why booth displays can't tell you which supplier matches your reference plant.
Nov 2, 2026
Satellite site screening vs. supplier directory search for physical fitDirectory filters confirm paperwork. Satellite site screening confirms plant type, scale and logistics access. Here's what each gives a dual-source search.
Oct 26, 2026
Comparing yard and loading-dock layout: reference plant vs. candidate siteHow to compare yard size, dock door count, and truck access between a reference plant and a second-source candidate before the first qualification call.
Oct 26, 2026
What is a reference site in supplier sourcing?What a reference site means in supplier sourcing, how to turn it into a site plan, and why it beats a spec sheet for second-sourcing decisions.
Oct 19, 2026
Field notes: the candidate that matched everything except the loading baysA near-perfect second-source candidate matched the reference plant on footprint and scale, then lost it all on loading bay geometry. Notes from the field.
Oct 19, 2026
How to tell an assembly plant from a fabrication plant in satellite imageryRoofline, yard contents, and parking field read differently for assembly versus fabrication sites. Here's what to look for before you shortlist a candidate.
Oct 14, 2026
How to size a target region before scouting supplier diversification sitesA practical way to set your target region search radius before a dual-source scouting trip, so the shortlist you bring back actually holds up.
Oct 14, 2026
What is a plant profile in supplier site screening?A plain-language breakdown of what a plant profile means in supplier site screening, and why it matters for a dual-source shortlist.
Oct 13, 2026
How to score logistics access against a reference supplierA field guide to scoring rail spur, highway, and port access when comparing candidate plants to your reference supplier for dual sourcing.
Oct 13, 2026
What counts as a comparable plant when screening second-source candidatesSIC codes and capacity tables miss the physical fit a second source needs. This piece sets out what makes a plant comparable to a reference supplier.
Oct 8, 2026
How long does it take to qualify a second source supplier?A stage-by-stage breakdown of second source qualification timelines, and why the screening stage is usually where the real time gets lost.
Oct 8, 2026
How to build a supplier risk scorecard for single-source componentsA part-level framework for scoring single-source risk and turning it into a register that justifies a second-source search.
Oct 8, 2026
Single sourcing risk vs. dual sourcing cost: building the internal caseHow to price single-sourcing risk against dual-sourcing cost, and the shortlist argument that gets budget approval.
Oct 8, 2026
What is a supplier capability assessment?A plain definition of a supplier capability assessment, how it differs from a plant audit, and what belongs on the checklist before you add a second source.